Sign In | Join Free | My hardware-wholesale.com |
|
Place of Origin : Chongqing, China (Mainland)
Brand Name : GREEN
Certification : CE,LVD,EMC
Supply Ability : 100000 Piece/Pieces per Month Soldering Station
Packaging Details : Green 2000 High-Frequency CE Certificate Soldering Station Packaging Detail:Individual package Carton Box
MOQ : 10 Pieces
Price : US $65.00-US $70.00
Model Number : Green 2000
Payment Terms : T/T, Western Union
Dimensions : 160*130*100mm, 120*93*140
Weight : 2600g
Usage : Welding Equipment
Color : Grey
Output Power : 90W
Temperature Stability : 26.6℉-37.4℉
Output Temperature : 392℉-896℉
Input Voltagle : 220V/110V
Feature : Temperature Adjustable
Certificate : CE EMC LVD
Green 2000 High-Frequency CE Certificate Soldering Station
Feature:
1, High-Frequency Eddy Current Heating, Heating And Temperature Fast, More Suitable for Low-Temperature Welding Sites, To Achieve High-Quality Lead-Free Welding.
2, Microcomputer Control, Push-Button Thermostat.
3, Automatic Sleep And Automatic Shutdown Function.
4, The Password-Type Temperature Lock Function, Effective Protection of The Production Process.
5, Anti-Static Design, A Variety of Soldering Iron to Choose From.
Product Name | High-Frequency Soldering Station |
Color | Black |
Temperature Stability | ±5°C |
Output Temperature | AC36V |
Input Voltagle | 220V/110V |
Tip to Ground Resistance | <2Ω |
Tip to Ground Potential | <2mA |
Dimensions | 165*130*105 |
Adjustment Method | Digital Key |
Certificate | ROHS SGS |
Features | Timely Delivery,High Quality and Good after Service |
Samples | Free Samples Offered |
Overseas Market Proved | Asia, Middle East and Africa Etc |
Q1: How Do We Place An Order?
A1: Pls Send Email Or Chat With Us Via Tm, Msn, Skype, And Let Us Know Your Requirements On Models,
Quantities,Colors. We Will Reply You With Proforma Invoice Based On Your Order Request.
Kindly Check The Pi,And If Everything Is Ok,We Will Deliver The Goods For You Asap After Got Your Payment.
Q2: How Do We Make The Payment?
A2: We Accept Paypal, Western Union, T/T.
Q3: What'S The Delivery Time?
A3: The Delivery Time Is Normally 1-3 Working Days After Payment.
Q4: How Would The Goods Be Shipped?
A4: We Ship Via DHI, UPS, TNT Normally.
Q5: Is Oem/Odm Available?
A5: Yes, It'S Available. The Oem Moq Is 1000Pcs. For Details, Please Kindly Contact The Sales Person.
![]() |
High Frequency Soldering Desoldering Station CE Certificate Green 2000 Images |